Burlington Deforest Road Rebuild
Sector: Cement • Location: Burlington, Vermont, United States of America
Source: Dodge
Excavate and backfill trench under the street, sidewalk and grass. Work includes excavation and disposal of concrete sidewalk, asphalt sidewalk and asphalt street. It also includes concrete encasement of all conduits installed under the street and installing plastic warning tape above the conduits during backfilling
- Status
- Closed
- Sector
- Cement, Government, Raw Materials, Road, Power Transmission, Power Generation (CCGT), Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Burlington, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Burlington Deforest Road Rebuild
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Excavate and backfill trench under the street, sidewalk and grass. Work includes excavation and disposal of concrete sidewalk, asphalt sidewalk and asphalt street. It also includes concrete encasement of all conduits installed under the street and installing plastic warning tape above the conduits during backfilling |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Burlington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Raw Materials, Road, Power Transmission, Power Generation (CCGT), Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
