Burlington Water Main Replacement
One of 10,000+ projects Taiyo tracks in Missouri.
Source: Dodge
Through the planning and design process of the Burlington Cycle Track it was identified that the City watermain under the corridor was beyond its useful life and relocation/replacement of the main should be prioritized. The existing 10-inch watermain is constructed of cast iron pipe that has been in service since the 1950s. The water line has been repaired multiple times in its years of service. T
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Metal, Waste Processing and Treatment, Commercial, Steel, Power Generation (CCGT)
- Location
- North Kansas City, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Burlington Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Through the planning and design process of the Burlington Cycle Track it was identified that the City watermain under the corridor was beyond its useful life and relocation/replacement of the main should be prioritized. The existing 10-inch watermain is constructed of cast iron pipe that has been in service since the 1950s. The water line has been repaired multiple times in its years of service. The existing main was installed with historic construction practices that utilized lead joints tha... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | North Kansas City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Metal, Waste Processing and Treatment, Commercial, Steel, Power Generation (CCGT) |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
