logo
ProjectClosed

Burnaby Fleet Ev Charging Stations

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Dodge USA

Demolition of the existing parking lot, associated supply and installation of EV chargers, lighting, communication gateways, and a solar canopy. 3,330m2 of asphalt paving, 220m of concrete curb and gutter; 92m of 250mm PVC storm sewer, 70m of 150mm CB lead; 6 catch basins, 2 manholes; 210m of perimeter fencing; 56 EV charging stations ; and 1 solar canopy

Status
Closed
Sector
Commercial, Electric Vehicles (EVs), Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Solar, Car parking, Government, Automotive, Power Generation (CCGT)
Location
Burnaby, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Burnaby Fleet Ev Charging Stations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Burnaby Fleet Ev Charging Stations” is an infrastructure initiative in the Commercial sector, located in Burnaby, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Demolition of the existing parking lot, associated supply and installation of EV chargers, lighting, communication gateways, and a solar canopy. 3,330m2 of asphalt paving, 220m of concrete curb and gutter; 92m of 250mm PVC storm sewer, 70m of 150mm CB lead; 6 catch basins, 2 manholes; 210m of perimeter fencing; 56 EV charging stations ; and 1 solar canopy

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Burnaby

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Electric Vehicles (EVs), Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Solar, Car parking, Government, Automotive, Power Generation (CCGT)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project