Burnaby Transit Centre (BTC) Facility Improvement
Sector: Mass Transit • Location: British Columbia, Canada
Source: Infrastructure Canada
The project will implement improvements to the Burnaby Transit Centre (BTC), which operates and maintains bus fleet for routes in North Vancouver, to increase is capacity to operate and maintain an additional fleet of 130 forty-foot equivalent (FFE) buses in line with the Metro Vancouver Mayors’ Vision. BTC is divided into two campuses: BTC-North (BTC-N) and BTC-South (BTC-S). Currently, BTC has 9
- Status
- Under Construction
- Sector
- Mass Transit, Commercial, Residential
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Burnaby Transit Centre (BTC) Facility Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will implement improvements to the Burnaby Transit Centre (BTC), which operates and maintains bus fleet for routes in North Vancouver, to increase is capacity to operate and maintain an additional fleet of 130 forty-foot equivalent (FFE) buses in line with the Metro Vancouver Mayors’ Vision. BTC is divided into two campuses: BTC-North (BTC-N) and BTC-South (BTC-S). Currently, BTC has 99% utilization (218 buses) and cannot support additional fleet without significant redevelopment. TransLink determined that it could increase capacity by up to 130 buses by relocating some functions provided in BTC to a new offsite location. The project will undertake the following to increase BTC’s capacity: Relocate most of the BTC-N central complex and BTC-S central stores functions off-site to a new property (located in Richmond, BC). The functions that remain at BTC will be reconfigured into the vacated BTC-S central stores space; Demolish the existing complex on BTC-N and pave the campus to support additional fleet storage; Build approximately three new maintenance bays at BTC to support the additional fleet; Renovate an approximately 100,000 sq ft complex at the new off-site location to support transferred BTC-N central complex and central stores functions; and Renovate BTC-S to accommodate transferred BTC-N functions. Renovations would include spaces for functions such as wood shop/carpentry, office space, and minor storage as well as upgrades to HVAC and mechanical systems as indicated during design. Detailed design (starting August 2022) is excluded from the ICIP application and only Implementation scope will be delivered under ICIP. Construction is scheduled to begin in June 2023, with completion planned for end of 2024. |
Original sector | Public Transit |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Commercial, Residential |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Canada
- Affordable Housing in the West Don Lands
- Highway Rehab -- Safety improvements Guelph Junction Railway Crossing
- Clanwilliam - Erickson - Handi-Van Purchase
- Brandon - Replacement of Information Centre/Transit Station
- Russell Binscarth - Handi-Van Purchase for Senior Service
- The Pas - Handi-Van Purchase
- Melita - Handi-Van Purchase
- Brandon - Fiber Optic Connectivity for Transit Station
