logo

Burnaby Transit Centre (BTC) Facility Improvement

Sector: Mass Transit • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

The project will implement improvements to the Burnaby Transit Centre (BTC), which operates and maintains bus fleet for routes in North Vancouver, to increase is capacity to operate and maintain an additional fleet of 130 forty-foot equivalent (FFE) buses in line with the Metro Vancouver Mayors’ Vision. BTC is divided into two campuses: BTC-North (BTC-N) and BTC-South (BTC-S). Currently, BTC has 9

Project Information FAQ

Project Information

4 Q
The project “Burnaby Transit Centre (BTC) Facility Improvement” is an infrastructure initiative in the Mass Transit sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will implement improvements to the Burnaby Transit Centre (BTC), which operates and maintains bus fleet for routes in North Vancouver, to increase is capacity to operate and maintain an additional fleet of 130 forty-foot equivalent (FFE) buses in line with the Metro Vancouver Mayors’ Vision. BTC is divided into two campuses: BTC-North (BTC-N) and BTC-South (BTC-S). Currently, BTC has 99% utilization (218 buses) and cannot support additional fleet without significant redevelopment. TransLink determined that it could increase capacity by up to 130 buses by relocating some functions provided in BTC to a new offsite location. The project will undertake the following to increase BTC’s capacity: • Relocate most of the BTC-N central complex and BTC-S central stores functions off-site to a new property (located in Richmond, BC). The functions that remain at BTC will be reconfigured into the vacated BTC-S central stores space; • Demolish the existing complex on BTC-N and pave the campus to support additional fleet storage; • Build approximately three new maintenance bays at BTC to support the additional fleet; • Renovate an approximately 100,000 sq ft complex at the new off-site location to support transferred BTC-N central complex and central stores functions; and • Renovate BTC-S to accommodate transferred BTC-N functions. Renovations would include spaces for functions such as wood shop/carpentry, office space, and minor storage as well as upgrades to HVAC and mechanical systems as indicated during design. Detailed design (starting August 2022) is excluded from the ICIP application and only Implementation scope will be delivered under ICIP. Construction is scheduled to begin in June 2023, with completion planned for end of 2024.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data