logo

Burnet Middle School Modernization

Sector: Education • Location: Austin, Texas, United States of America

Source: Dodge

Project
Closed

Burnet Middle School, located at 8401 Hathaway Dr, in North Central Austin, was built in 1961. This full modernization project will be designed to accommodate a planned capacity of 1,100 students. A full modernization project is typically the whole or selective demolition of an existing facility, and new construction that must be designed in compliance with Austin ISD Educational Specifications an

Status
Closed
Sector
Education, Cement, Steel, Government, Commercial, Power Transmission, Power Generation (CCGT)
Location
Austin, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Burnet Middle School Modernization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Burnet Middle School Modernization” is an infrastructure initiative in the Education sector, located in Austin, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Burnet Middle School, located at 8401 Hathaway Dr, in North Central Austin, was built in 1961. This full modernization project will be designed to accommodate a planned capacity of 1,100 students. A full modernization project is typically the whole or selective demolition of an existing facility, and new construction that must be designed in compliance with Austin ISD Educational Specifications and the Project Development Manual. This is an occupied campus that may require onsite swing space.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Austin

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Education, Cement, Steel, Government, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project