logo

Burundi - Jiji and Mulembwe Hydropower Project (PHJIMU)

Sector: Water Supply and Storage • Location: Burundi

Source: African Development Bank (AfDB)

Project

The Jiji and Mulembwe Hydropower Plants Development Project aims to improve Burundi’s electric power generation. With the combined installed capacity of the two plants, estimated at 48 MW, the national installed power generation capacity (which is now 39 MW) will more than double. The project concerns the development of two hydropower plants and the construction of infrastructure required for elec

Project Information FAQ

Project Information

4 Q
The project “Burundi - Jiji and Mulembwe Hydropower Project (PHJIMU)” is an infrastructure initiative in the Water Supply and Storage sector, located in Burundi. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Jiji and Mulembwe Hydropower Plants Development Project aims to improve Burundi’s electric power generation. With the combined installed capacity of the two plants, estimated at 48 MW, the national installed power generation capacity (which is now 39 MW) will more than double. The project concerns the development of two hydropower plants and the construction of infrastructure required for electric power transmission and distribution. These two development initiatives are located in the south-east of the country in Bururi Province. The two hydropower plants are about 3.75 km apart and are currently the most promising energy projects in this part of the country. The project will have a positive impact on the sustainability of the energy sector in particular, and Burundi’s economy in general. It will also enable the supply of electricity to local communities in the project area. As such, it will contribute to reducing the country’s energy shortfall and promoting green and inclusive growth. The project is structured into 3 (three) components: Component A comprises the Hydropower Plants and Related Infrastructure, Component B focuses on project technical assistance and Component C deals with electricity sector institutional development support.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data