Burundi - Nile Equatorial Lakes Countries Power Interconnection Project (NELSAP)

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

This project aims to provide a grant of an amount not exceeding EUR 14,700,000 to the Republic of Burundi to finance the funding gap of the Interconnection of Electric Grids of Nile Equatorial Lakes Countries. The initial design of the project consists of the construction of 769 km of 220 kV and 110 kV transmission lines and 17 transformer stations to interconnect the electric grids of Nile Equato

Sector
Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Burundi - Nile Equatorial Lakes Countries Power Interconnection Project (NELSAP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Burundi - Nile Equatorial Lakes Countries Power Interconnection Project (NELSAP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project aims to provide a grant of an amount not exceeding EUR 14,700,000 to the Republic of Burundi to finance the funding gap of the Interconnection of Electric Grids of Nile Equatorial Lakes Countries. The initial design of the project consists of the construction of 769 km of 220 kV and 110 kV transmission lines and 17 transformer stations to interconnect the electric grids of Nile Equatorial Lakes Countries, namely; Burundi, Kenya, Uganda, DR Congo and Rwanda in order to improve transboundary energy exchange among those countries. The shortfall arose mainly from depreciation of loan currencies (UA and JPY) against the contract currencies of EUR and US Dollar and variation orders due to changes in scope. This additional funding will enable the construction of a new 220 kV Kamanyola - Bujumbura line which involves the construction in Bujumbura of a new 220/110/30/10 kV substation which was not initially foreseen in the project.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project