This project aims to provide a grant of an amount not exceeding EUR 14,700,000 to the Republic of Burundi to finance the funding gap of the Interconnection of Electric Grids of Nile Equatorial Lakes Countries. The initial design of the project consists of the construction of 769 km of 220 kV and 110 kV transmission lines and 17 transformer stations to interconnect the electric grids of Nile Equato

Project Information FAQ

Project Information

4 Q
The project “Burundi - Nile Equatorial Lakes Countries Power Interconnection Project (NELSAP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project aims to provide a grant of an amount not exceeding EUR 14,700,000 to the Republic of Burundi to finance the funding gap of the Interconnection of Electric Grids of Nile Equatorial Lakes Countries. The initial design of the project consists of the construction of 769 km of 220 kV and 110 kV transmission lines and 17 transformer stations to interconnect the electric grids of Nile Equatorial Lakes Countries, namely; Burundi, Kenya, Uganda, DR Congo and Rwanda in order to improve transboundary energy exchange among those countries. The shortfall arose mainly from depreciation of loan currencies (UA and JPY) against the contract currencies of EUR and US Dollar and variation orders due to changes in scope. This additional funding will enable the construction of a new 220 kV Kamanyola - Bujumbura line which involves the construction in Bujumbura of a new 220/110/30/10 kV substation which was not initially foreseen in the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data