logo

Bus Hoists

Sector: Car parking • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Bus hoist replacements. There are over 140 bus hoists located in bus garages throughout the Toronto Transit Commission (TTC). These hoists are in varying degrees of age and condition. A condition assessment was completed in 2011 identifying 123 hoists requiring replacement at the following bus garages which are being replaced under this project: 1. Arrow Road Garage (16); 2. Duncan Shop (40); 3. L

Project Information FAQ

Project Information

5 Q
The project “Bus Hoists” is an infrastructure initiative in the Car parking sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bus hoist replacements. There are over 140 bus hoists located in bus garages throughout the Toronto Transit Commission (TTC). These hoists are in varying degrees of age and condition. A condition assessment was completed in 2011 identifying 123 hoists requiring replacement at the following bus garages which are being replaced under this project: 1. Arrow Road Garage (16); 2. Duncan Shop (40); 3. Lakeshore Garage (15); 4. Malvern Garage (17); 5. Wilson Garage (16); 6. Eglinton Garage (16); 7. Mount Dennis Garage (2); 8. Birchmount Garage (1) Other work covered under this project includes Implementation of bus hoist safety zones at all hoist positions and the required facility modifications which include lubertoriums, exhaust ducts, lighting, line painting, repositioning of doorways and walkways to facilitate scheduled maintenance of the new fleet of articulated buses. Hoist replacements contribute to increased capacity and increased lifespan of bus garages which are kept in a better state of good repair.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data