Bus Rapid Transit (BRT) Station Platform
Sector: Road • Location: Saskatoon, Saskatchewan, Canada
Source: Dodge USA
The City of Saskatoon seeks to hire contractors to perform civil construction for fourteen (14) Bus Rapid Transit (BRT) Station platforms at various locations throughout the city. The work includes removal of existing surface infrastructure, supply and installation of concrete, asphalt, and underground utilities, and quality control activities
- Status
- Closed
- Sector
- Road, Cement, Power Transmission, Government, Commercial, Power Generation (CCGT)
- Location
- Saskatoon, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bus Rapid Transit (BRT) Station Platform
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Saskatoon seeks to hire contractors to perform civil construction for fourteen (14) Bus Rapid Transit (BRT) Station platforms at various locations throughout the city. The work includes removal of existing surface infrastructure, supply and installation of concrete, asphalt, and underground utilities, and quality control activities |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Saskatoon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Power Transmission, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
