Bus Rapid Transit (BRT) System in Accra, Ghana

Sector: Mass Transit • Location: Accra, Greater Accra Region, Ghana

Source: APRI (Africa Policy Research Institute)

Project
Ongoing With Challenges

The Bus Rapid Transit (BRT) system in Accra was initially launched in 2005 as a pilot project on the Kinbu–Adenta corridor with 12 buses operating on a dedicated lane. The project faced setbacks including weak enforcement, insufficient infrastructure, and opposition from informal transport operators, leading to its suspension in 2007. Subsequent efforts included the Ghana Urban Transport Project (

Project Information FAQ

Project Information

3 Q
The project “Bus Rapid Transit (BRT) System in Accra, Ghana” is an infrastructure initiative in the Mass Transit sector, located in Accra, Greater Accra Region, Ghana. Taiyo aggregates data on it from APRI (Africa Policy Research Institute).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing with challenges

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bus Rapid Transit (BRT) system in Accra was initially launched in 2005 as a pilot project on the Kinbu–Adenta corridor with 12 buses operating on a dedicated lane. The project faced setbacks including weak enforcement, insufficient infrastructure, and opposition from informal transport operators, leading to its suspension in 2007. Subsequent efforts included the Ghana Urban Transport Project (GUTP) and a national BRT policy drafted in 2007. Only 3.5 km of dedicated lanes were constructed, limiting the system's effectiveness. In 2016, a downgraded system called Quality Bus Service (QBS) or 'Aayalolo' was introduced but collapsed in 2018 due to low patronage and financial issues. Operations resumed in 2019 but challenges persist. The project has been hampered by institutional fragmentation, lack of integrated planning, stakeholder resistance, lack of dedicated lanes, and financial constraints.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data