BUSAN PORT EXPANSION
Sector: Seaport • Location: Korea, Republic of
Source: World Bank Group
The Port Project will provide: (a) at Busan: (i) a composite pier; all necessary equipment for handling containers and unloading grain; (ii) a bulk handling pier; appropriate cranes and bulkhandling systems; (iii) dredging to give a 13.5 m deep access channel at the composite pier; (iv) a new international ferry berth with passenger and roll-on/roll-off traffic facilities; rehabilitation of Pier 1
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Port Project will provide: (a) at Busan: (i) a composite pier; all necessary equipment for handling containers and unloading grain; (ii) a bulk handling pier; appropriate cranes and bulkhandling systems; (iii) dredging to give a 13.5 m deep access channel at the composite pier; (iv) a new international ferry berth with passenger and roll-on/roll-off traffic facilities; rehabilitation of Pier 1 North for general cargo; (v) coastal ferry berths with passenger facilities; (vi) rehabilitation of Pier 2 for general cargo; (b) at Mukho: (i) new coal piers A and B with improvements to existing conveyor systems, and new mechanical loaders; (ii) A new belt/reclaimer system in the existing open storage area; (iii) dredging at the new coal piers; (iv) raising the existing East Breakwater to +5.0 m elevation and strengthening the side slopes; and (v) rehabilitation of existing cement and general cargo berths. (c) Consultants' Services: (i) final design and supervision of the above works; (ii) preparation of a second stage development plan for the Borrower's first class ports; and formulation of financial, operational and management procedures in connection with and for KPA, and on-the-job training of staff in their application. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
