logo
ProjectClosed

BUSAN PORT EXPANSION

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The Port Project will provide: (a) at Busan: (i) a composite pier; all necessary equipment for handling containers and unloading grain; (ii) a bulk handling pier; appropriate cranes and bulkhandling systems; (iii) dredging to give a 13.5 m deep access channel at the composite pier; (iv) a new international ferry berth with passenger and roll-on/roll-off traffic facilities; rehabilitation of Pier 1

Status
Closed
Sector
Seaport, Government
Location
South Korea
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about BUSAN PORT EXPANSION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BUSAN PORT EXPANSION” is an infrastructure initiative in the Seaport sector, located in Korea, Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Port Project will provide: (a) at Busan: (i) a composite pier; all necessary equipment for handling containers and unloading grain; (ii) a bulk handling pier; appropriate cranes and bulkhandling systems; (iii) dredging to give a 13.5 m deep access channel at the composite pier; (iv) a new international ferry berth with passenger and roll-on/roll-off traffic facilities; rehabilitation of Pier 1 North for general cargo; (v) coastal ferry berths with passenger facilities; (vi) rehabilitation of Pier 2 for general cargo; (b) at Mukho: (i) new coal piers A and B with improvements to existing conveyor systems, and new mechanical loaders; (ii) A new belt/reclaimer system in the existing open storage area; (iii) dredging at the new coal piers; (iv) raising the existing East Breakwater to +5.0 m elevation and strengthening the side slopes; and (v) rehabilitation of existing cement and general cargo berths. (c) Consultants' Services: (i) final design and supervision of the above works; (ii) preparation of a second stage development plan for the Borrower's first class ports; and formulation of financial, operational and management procedures in connection with and for KPA, and on-the-job training of staff in their application.

Original sector

Transportation

Location

Country

South Korea

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Seaport, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project