Bush Lake Stormwater Lift Station Updates
Sector: Water Supply and Storage • Location: Bloomington, Minnesota, United States of America
Source: Dodge USA
- Replace two submersible pumps 2. Replace control panel, internal float switches, and condensation heater. 3. Remove milfoil screen (or provide better cleaning mechanism.) The City of Bloomington may be seeking for a consultant to provide study services for Bush Lake Stormwater Lift Station Updates.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. Replace two submersible pumps 2. Replace control panel, internal float switches, and condensation heater. 3. Remove milfoil screen (or provide better cleaning mechanism.) The City of Bloomington may be seeking for a consultant to provide study services for Bush Lake Stormwater Lift Station Updates. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
