Business Park Utility Infrastructure Improvements REBID
Sector: Water Supply and Storage • Location: Lubbock, Texas, United States of America
Source: Dodge USA
Sealed Bids for construction of Roadway Improvements will be received by Reese Technology Center, at the office of Murvat Musa, Executive Director, 9801 Reese Blvd., Suite 200, Lubbock, Texas 79416 until 2:30 PM, local time, on January 15, 2025, at which time Bids received will be opened and read. Project consists of 3,000 linear feet of 12-inch PVC main waterline with fire hydrants and associated
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Power Transmission, Commercial, Car parking, Power Generation (CCGT), Residential, Waste Processing and Treatment, Manufacturing (Industrial), Automotive
- Location
- Lubbock, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Business Park Utility Infrastructure Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sealed Bids for construction of Roadway Improvements will be received by Reese Technology Center, at the office of Murvat Musa, Executive Director, 9801 Reese Blvd., Suite 200, Lubbock, Texas 79416 until 2:30 PM, local time, on January 15, 2025, at which time Bids received will be opened and read. Project consists of 3,000 linear feet of 12-inch PVC main waterline with fire hydrants and associated fittings. In addition, Project Scope includes approximately 1,700 linear feet of 10-inch and 12-... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Lubbock |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Commercial, Car parking, Power Generation (CCGT), Residential, Waste Processing and Treatment, Manufacturing (Industrial), Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
