Business Replacement Building
Pre-design · California · Last reported Mar 2024
Source: Dodge USA
This project proposes to construct a new classroom and faculty office building (#12) to replace the existing aging 34,200 ASF/59,100 GSF Business building (#2), which was constructed in 1953. The new facility will provide an increase in space that is fully up to code and ADA accessible, with right-sized classrooms and laboratories to meet current and anticipated need for flexible, interactive spac
- Status
- Prospective
- Sector
- Commercial, Education, Residential
- Location
- San Francisco, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Business Replacement Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project proposes to construct a new classroom and faculty office building (#12) to replace the existing aging 34,200 ASF/59,100 GSF Business building (#2), which was constructed in 1953. The new facility will provide an increase in space that is fully up to code and ADA accessible, with right-sized classrooms and laboratories to meet current and anticipated need for flexible, interactive space and hands-on learning |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Residential |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
