Butano Creek Floodplain Restoration Project
Sector: Bridge • Location: California, United States of America
Source: RCD Project Tracker
The project, completed in fall of 2016 and done in partnership with Peninsula Open Space Trust, reconnected Butano Creek to approximately 100 acres of its floodplain and enhances natural creek function. This project restored 10% of the watershed’s historical floodplain that had been lost in the previous 100 years. The work that was done here will: -Hold 150,000 tons of sediment back from contribut
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | post-implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project, completed in fall of 2016 and done in partnership with Peninsula Open Space Trust, reconnected Butano Creek to approximately 100 acres of its floodplain and enhances natural creek function. This project restored 10% of the watershed’s historical floodplain that had been lost in the previous 100 years. The work that was done here will: -Hold 150,000 tons of sediment back from contributing to flooding at -Pescadero Creek Road and filling in Pescadero Marsh. -Provide protection for juvenile steelhead and salmon during high winter flows; -Enable fish to migrate through the reach; -Improve water quality in a watershed that is listed under the Clean Water Act as impaired by sediment; -Enhance and restore habitats for threatened and endangered wildlife; and Help recharge groundwater. The project took place at multiple sites along a stretch of Butano Creek where the creek had become disconnected from its historic floodplain because of human activities in the watershed, including removing wood and straightening the channel. The restoration actions – which included engineered log jams, a rock ramp, floodplain connector channels, and pulling trees on the bank across the channel while keeping them alive– will restore natural ecosystem function to the creek. They will raise the creek bed and lower banks so that higher flows spill over onto the floodplain, wetting it more regularly and dropping out sediment. The actions will also reduce the erosion of the creek banks and downcutting of the creek bed. Several imperiled species will benefit from the wetted floodplain habitat, improved creek habitat, and improved water quality, including steelhead trout (Oncorhynchus mykiss), California red-legged frog (Rana draytonii) and San Francisco garter snake (Thamnophis sirtalis tetrataenia). There are also significant downstream benefits. Less sediment will build up in the creek under the Pescadero Creek Road bridge, where the resulting frequent flooding is a public safety hazard and has adverse economic impacts to the town of Pescadero. Further downstream, Pescadero Marsh is filling in and will benefit from the 150,000 tons of sediment that are held back upstream. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
