Butler Water Main Replacement N of Foster Pl/Waveland Park
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The replacement of the watermain on Butler Drive from north of Foster Pl to the Waveland Park parking lot. The project will either be directionally bored and not require resurfacing after construction or otherwise the street will be resurfaced separately by the Annual Pavement Resurfacing Program (See PW-RDB-01-09).
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive
- Location
- Lake Forest, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Butler Water Main Replacement N of Foster Pl/Waveland Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The replacement of the watermain on Butler Drive from north of Foster Pl to the Waveland Park parking lot. The project will either be directionally bored and not require resurfacing after construction or otherwise the street will be resurfaced separately by the Annual Pavement Resurfacing Program (See PW-RDB-01-09). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Lake Forest |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
