Butler Water System Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work generally consists of the following: 550 LF of 6 PVC Water Main, 60 LF of 10 Steel Casing, 2 Fire Hydrants, 3 ~ 6 Valves, 8 Service Transfers, 500 LF of 3/4" PE Service Tubing, 285 LF of 2" PE Casing, Bored, and other related items.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment, Metal
- Location
- Butler, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Butler Water System Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of the following: 550 LF of 6 PVC Water Main, 60 LF of 10 Steel Casing, 2 Fire Hydrants, 3 ~ 6 Valves, 8 Service Transfers, 500 LF of 3/4" PE Service Tubing, 285 LF of 2" PE Casing, Bored, and other related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Butler |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment, Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
