Butner Food Distribution Warehouse Addition
Sector: Raw Materials • Location: Creedmoor, North Carolina, United States of America
Source: Dodge USA
The Work includes a 28,879 SF warehouse addition to the existing 85,466 SF Butner Food Distribution Warehouse, 1015 Food Distribution Drive (a.k.a. 2582 West Lyon Station Road), Creedmoor, NC 27522. The warehouse addition project includes 2,297 SF Refrigerated Dock Service with (3) overhead doors to Loading Dock at 24,103 SF concrete paved Truck Court addition to existing Truck Court, 20,384 SF Dr
- Status
- Closed
- Sector
- Raw Materials, Warehouse, Residential, Road, Consumer Products, Steel, Cement, Commercial, Manufacturing (Industrial)
- Location
- Creedmoor, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Butner Food Distribution Warehouse Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes a 28,879 SF warehouse addition to the existing 85,466 SF Butner Food Distribution Warehouse, 1015 Food Distribution Drive (a.k.a. 2582 West Lyon Station Road), Creedmoor, NC 27522. The warehouse addition project includes 2,297 SF Refrigerated Dock Service with (3) overhead doors to Loading Dock at 24,103 SF concrete paved Truck Court addition to existing Truck Court, 20,384 SF Dry Storage, 3585 SF and 3593 SF Cooler/Freezers, 246 SF Office, 64 SF Men and Women's Toilets, 27 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Creedmoor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Warehouse, Residential, Road, Consumer Products, Steel, Cement, Commercial, Manufacturing (Industrial) |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
