Butte County Howe Landfill Construction

Sector: Water Supply and Storage • Location: Arco, Idaho, United States of America

Source: Dodge

The project consists of the construction of a 29-acre final cover system to overlie the waste area at the Howe Landfill. The 30-inch-thick cover system contains from the bottom to top, 24 inches of compacted on-site native soils, and 6 inches of on-site fine-grained material. The closure area shall be seeded with a native seed mix. The project also includes the construction of a stormwater pond an

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Consumer Products, Government
Location
Arco, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Butte County Howe Landfill Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Butte County Howe Landfill Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Arco, Idaho, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the construction of a 29-acre final cover system to overlie the waste area at the Howe Landfill. The 30-inch-thick cover system contains from the bottom to top, 24 inches of compacted on-site native soils, and 6 inches of on-site fine-grained material. The closure area shall be seeded with a native seed mix. The project also includes the construction of a stormwater pond and stormwater control ditches.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Arco

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Consumer Products, Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project