Butterfly Solar-plus-storage Project
Sector: Power Generation (CCGT) • Location: Wrexham, Wales, United Kingdom
Source: pv magazine International
The Butterfly (Glöyn Byw) solar-plus-storage project was a proposed 99.9 MW solar farm with co-located storage planned across three parcels of agricultural land south of Wrexham, Wales, with underground cabling to the Legacy National Grid substation. The project was withdrawn due to grid connection availability making it unviable at this stage.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Butterfly (Glöyn Byw) solar-plus-storage project was a proposed 99.9 MW solar farm with co-located storage planned across three parcels of agricultural land south of Wrexham, Wales, with underground cabling to the Legacy National Grid substation. The project was withdrawn due to grid connection availability making it unviable at this stage. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
