Buttonwood Brook Water Quality Improvement Phase 2
Sector: Water Supply and Storage • Location: New Bedford, Massachusetts, United States of America
Source: Dodge USA
The work within this project includes but is not limited to using best management practice stormwater green infrastructure techniques to capture and treat water that currently flows from impervious surfaces into Buttonwood Brook. The work includes the construction of two bioretention basins, planting and permeable pavement at medians on Kempton Street, two pedestrian bridges, pedestrian walkways a
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- New Bedford, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Buttonwood Brook Water Quality Improvement Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work within this project includes but is not limited to using best management practice stormwater green infrastructure techniques to capture and treat water that currently flows from impervious surfaces into Buttonwood Brook. The work includes the construction of two bioretention basins, planting and permeable pavement at medians on Kempton Street, two pedestrian bridges, pedestrian walkways at Buttonwood Park, construction of permeable parking at Brownell Avenue, new drainage and parking... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | New Bedford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
