logo

Butwal Andikhola Expansion SHPP

Sector: Hydro • Location: Nepal

Source: World Bank Group

Project
Active

Butwal Power Company was planning the expansion of the 5.1MW Andhikola small hydropower plant (run-of-river) to 9.4MW. The project became operational in 1991 and was privatized with Butwal in 2003. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited.

The project consisted of 3 Pelton turbines of 1.7MW e

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Butwal Andikhola Expansion SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Butwal Andikhola Expansion SHPP” is an infrastructure initiative in the Hydro sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Butwal Power Company was planning the expansion of the 5.1MW Andhikola small hydropower plant (run-of-river) to 9.4MW. The project became operational in 1991 and was privatized with Butwal in 2003. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited. The project consisted of 3 Pelton turbines of 1.7MW each, originally built from used equipment from Norway. The electric equipment is close to worn out, and this is a rehabilitation exercise. Detailed Project Report has been completed. Contractors have been selected. Generation license has been obtained and the PPA with NEA has been signed. The power is to be evacuated via a 33kV line, interconnecting with the 132kV Syangja Substation, near Rang Khola. Commissioning was epxected for 2012. Total output was expected to be 68.38GWh. Financing was to be provided by the IFC as well as local banks. No furhter information was available. http://www.bpc.com.np/index.php?option=com_page&task=details&id=24

Original sector

Energy

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project