Butwal Lower Nyadi SHPP
Sector: Commercial • Location: Nepal
Source: World Bank Group
Lower Nyadi Hydroelectric Project Company, was developing the 4.5MW Lower Nyadi hydropower plant, on the Lower Nyadi River, Lamjung District. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited.
The project was reported as operational by the NEA in August 2005. No further information was available. The
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government, Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Butwal Lower Nyadi SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lower Nyadi Hydroelectric Project Company, was developing the 4.5MW Lower Nyadi hydropower plant, on the Lower Nyadi River, Lamjung District. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited. The project was reported as operational by the NEA in August 2005. No further information was available. The project was purchased by Butwal Power Company from LEDCO in 2006, with the plan to expand it to 20MW, which is currently upgraded to 30MW. Under LEDCO, the project conducted its feasibility study in 2000, and the EIA was conducted by Butwal Power Company - approved and obtained in March 2000. The 30MW expanded plan has completed its feasibility study. The PPA and Connection Agreement with the NEA were also started, and progressing (not completed). Construction was expected to start in 2012, and commissioning was planned for 2015. Total output was to be 168GWh annually, to be evacuated via the Marsyangdi Corridor Transmission Line, planned by NEA at Khudi Hub. Consulting was provided by Hydro Consult, from Kathmandu. Underground design was performed by Mott Macdonald International (UK). Total cost was estimated at US$6 million. Financial closure date was ESTIMATED at January 2005. TO BE EXPANDED TO 30MW SOON http://www.bpc.com.np/index.php?option=com_page&task=details&id=23 |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government, Hydro |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project