Lower Nyadi Hydroelectric Project Company, was developing the 4.5MW Lower Nyadi hydropower plant, on the Lower Nyadi River, Lamjung District. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited.

The project was reported as operational by the NEA in August 2005. No further information was available. The

Project Information FAQ

Project Information

4 Q
The project “Butwal Lower Nyadi SHPP” is an infrastructure initiative in the Hydro sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lower Nyadi Hydroelectric Project Company, was developing the 4.5MW Lower Nyadi hydropower plant, on the Lower Nyadi River, Lamjung District. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited. The project was reported as operational by the NEA in August 2005. No further information was available. The project was purchased by Butwal Power Company from LEDCO in 2006, with the plan to expand it to 20MW, which is currently upgraded to 30MW. Under LEDCO, the project conducted its feasibility study in 2000, and the EIA was conducted by Butwal Power Company - approved and obtained in March 2000. The 30MW expanded plan has completed its feasibility study. The PPA and Connection Agreement with the NEA were also started, and progressing (not completed). Construction was expected to start in 2012, and commissioning was planned for 2015. Total output was to be 168GWh annually, to be evacuated via the Marsyangdi Corridor Transmission Line, planned by NEA at Khudi Hub. Consulting was provided by Hydro Consult, from Kathmandu. Underground design was performed by Mott Macdonald International (UK). Total cost was estimated at US$6 million. Financial closure date was ESTIMATED at January 2005. TO BE EXPANDED TO 30MW SOON http://www.bpc.com.np/index.php?option=com_page&task=details&id=23

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data