Lower Nyadi Hydroelectric Project Company, was developing the 4.5MW Lower Nyadi hydropower plant, on the Lower Nyadi River, Lamjung District. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited.
The project was reported as operational by the NEA in August 2005. No further information was available. The
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Lower Nyadi Hydroelectric Project Company, was developing the 4.5MW Lower Nyadi hydropower plant, on the Lower Nyadi River, Lamjung District. Butwal was a privatized company (2003), and is 15% owned by the government of Nepal. Majority ownership (69%) is held by Shangri-La Energy Limited. The project was reported as operational by the NEA in August 2005. No further information was available. The project was purchased by Butwal Power Company from LEDCO in 2006, with the plan to expand it to 20MW, which is currently upgraded to 30MW. Under LEDCO, the project conducted its feasibility study in 2000, and the EIA was conducted by Butwal Power Company - approved and obtained in March 2000. The 30MW expanded plan has completed its feasibility study. The PPA and Connection Agreement with the NEA were also started, and progressing (not completed). Construction was expected to start in 2012, and commissioning was planned for 2015. Total output was to be 168GWh annually, to be evacuated via the Marsyangdi Corridor Transmission Line, planned by NEA at Khudi Hub. Consulting was provided by Hydro Consult, from Kathmandu. Underground design was performed by Mott Macdonald International (UK). Total cost was estimated at US$6 million. Financial closure date was ESTIMATED at January 2005. TO BE EXPANDED TO 30MW SOON http://www.bpc.com.np/index.php?option=com_page&task=details&id=23 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |