logo
ProjectCompleted

Butwal Power Co

Completed · Nepal

Source: International Finance Corporation (IFC)

_x000C_Butwal Power Company Ltd (the “Company” or “BPC”) is a Nepalese hydro-power generation company that operates the 5.1MW Andhi Khola hydro project and the 12MW Jhimruk hydropower projects in western Nepal and the 4MW Khudi (through its subsidiary, Khudi Hydropower Company). In addition to hydro-power generation, BPC is involved in rural electricity distribution and engineering and consulting

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Power Generation (CCGT), Hydro, Government
Location
Nepal
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Butwal Power Co

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Butwal Power Co” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

_x000C_Butwal Power Company Ltd (the “Company” or “BPC”) is a Nepalese hydro-power generation company that operates the 5.1MW Andhi Khola hydro project and the 12MW Jhimruk hydropower projects in western Nepal and the 4MW Khudi (through its subsidiary, Khudi Hydropower Company). In addition to hydro-power generation, BPC is involved in rural electricity distribution and engineering and consulting services to hydropower and other infrastructure projects in Nepal. The Andhi Khola Hydroelectric Project is a run-of-river installation located in Syangja District in western Nepal constructed by a development agency – the United Mission to Nepal – with second-hand equipment provided by the Norwegian government and commissioned in 1991. The project was originally conceived, and continues to operate, as a developmental anchor for rural electrification, irrigation and small enterprise development initiatives in Syangja District. BPC proposes to upgrade the installed capacity of the existing project (“the Project”) from 5.1 MW to 9.4 MW by: installing new generation and electro-mechanical equipment in the underground powerhouse; increasing the volume of water diverted to the powerhouse by increasing the height of a diversion structure in the Andhi Khola stream up river of the powerhouse by 2.3 meters and improving other headwork structures, including the expansion of the desilting basin; and enlarging the tailrace that discharges water from the powerhouse to the Kali Gandaki River.

Original sector

BB - Small Hydro (<10MW) - Renewable Energy Generation

Location

Country

Nepal

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Power Generation (CCGT), Hydro, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project