logo

Buzios7 Project

Sector: Oil and Gas • Location: Brazil

Source: Offshore Technology

Project
Under Construction

China National Offshore Oil Corporation (CNOOC) has commenced production at the Buzios7 project at the Buzios field, which is located in the pre-salt layer of the Santos Basin, offshore Brazil. The field is expected to reach a production level of one million barrels per day by mid-2025 and 2 million barrels per day by 2030.

Status
Under Construction
Sector
Oil and Gas
Location
Brazil
Updated
22 Jul 2026
Source
Offshore Technology

ConstructChat

Ask ConstructChat about Buzios7 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Buzios7 Project” is an infrastructure initiative in the Oil and Gas sector, located in Brazil. Taiyo aggregates data on it from Offshore Technology.

Participants

Company

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

China National Offshore Oil Corporation (CNOOC) has commenced production at the Buzios7 project at the Buzios field, which is located in the pre-salt layer of the Santos Basin, offshore Brazil. The field is expected to reach a production level of one million barrels per day by mid-2025 and 2 million barrels per day by 2030.

Original sector

Energy

Location

Country

Brazil

Source

Source

Offshore Technology

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project