BV House / Bruno Vanbesien
Closed · Last reported Dec 2023
Source: ArchDaily
Text description provided by the architects.As lots of families still leave the city, this house demonstrates that one can have a creative, ecological, and spacious home in town. On the back side, the house opens onto a park. As the entire site was built up, it was more important to remove than to build. The introduced garden and courtyard give light and stimulate vistas throughout the building. T
- Status
- Closed
- Sector
- Steel, Cement, Residential, Metal, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about BV House / Bruno Vanbesien
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.As lots of families still leave the city, this house demonstrates that one can have a creative, ecological, and spacious home in town. On the back side, the house opens onto a park. As the entire site was built up, it was more important to remove than to build. The introduced garden and courtyard give light and stimulate vistas throughout the building. The idea was to give a meaningful interpretation of the four floors. Although the kitchen on the ground floor and the living room on the first floor are detached, the vide relates them.By opening the two facades on the first floor, the light flows excessively into the living area and thus the kitchen. The external and internal slats on the front guarantee privacy from passersby and stimulate a fascinating play of light that constantly changes during the day. On the back, the living room opens onto a deep terrace. To guarantee the privacy of our neighbors a distance of 1,9 meters is kept off the dividing walls.The green roof is formed by heightening the ceilings on the ground level. The differentiation in ceiling heights emphasises the spaciousness of the living, while in the more functional spaces downstairs, the ceiling is lowered to 2,35 meters. That’s why we got a ceiling height of 3,10 meters in the living room.Thanks to the patio and staircase the kitchen also benefits from an abundance of daylight. “The two upper floors kept their original height. The interior is a ‘Gesamtkustwerk” full of details created uniquely for this house an mostly made on the spot: he concrete of course, but also the steel column, the welded stairs, the terrazzo bath, the cooker hood, the ash tree furniture and most of the lighting fixtures. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Residential, Metal, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- Fire Lake Mining
- Kearl Ore Preparation Plant
