BW ESS Germany 1GW Long-Duration Battery Energy Storage System
Sector: Energy Storage • Location: Klostermansfeld, Saxony-Anhalt, Germany
Source: Energy-Storage.News
BW ESS is developing its first project in Germany, a large-scale battery energy storage system (BESS) with a capacity of 1GW and a duration of up to 5.7 hours, located in Klostermansfeld, Saxony-Anhalt. The project is connected to a critical substation operated by the 50Hertz transmission system operator and is part of a significant infrastructure upgrade including the SuedOstLink interconnector.
- Status
- Under Construction
- Sector
- Energy Storage, Commercial
- Location
- Klostermansfeld, Saxony-Anhalt, Germany
- Updated
- 22 Jul 2026
- Source
- Energy-Storage.News
ConstructChat
Ask ConstructChat about BW ESS Germany 1GW Long-Duration Battery Energy Storage System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BW ESS is developing its first project in Germany, a large-scale battery energy storage system (BESS) with a capacity of 1GW and a duration of up to 5.7 hours, located in Klostermansfeld, Saxony-Anhalt. The project is connected to a critical substation operated by the 50Hertz transmission system operator and is part of a significant infrastructure upgrade including the SuedOstLink interconnector. Early-stage construction has begun with road reinforcement and topsoil removal, and the project targets commercial operation date in Q4 2028. BW ESS is in the process of contracting suppliers and EPCs, aiming to optimize the duration and ensure grid fee exemption by August 4, 2029. |
Original sector | Energy Storage |
Location
Country | Germany |
State | Saxony-Anhalt |
City | Klostermansfeld |
Source
Source | Energy-Storage.News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
