logo

BW II – Industrial Building in Viana do Castelo / Multiprojectus

Sector: Geothermal

Source: ArchDaily

Project
Closed

The proposal focuses on the main social and administrative block, opting for an architectural language that gives unity and continuity to the whole. The research focused on the “skin” of the main elevation, based on the search for a single cladding material (prefabricated concrete panel), which adapts to and standardizes all the project's situations and needs. The main elevation is designed by rep

Project Information FAQ

Project Information

3 Q
The project “BW II – Industrial Building in Viana do Castelo / Multiprojectus” is an infrastructure initiative in the Geothermal sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposal focuses on the main social and administrative block, opting for an architectural language that gives unity and continuity to the whole. The research focused on the “skin” of the main elevation, based on the search for a single cladding material (prefabricated concrete panel), which adapts to and standardizes all the project's situations and needs. The main elevation is designed by repeating vertical “slats” in a prefabricated concrete panel, based on a matrix that defines the solution. The “rule” imposes itself and makes up the main language of the complex. Due to the large development of the main elevation, there are several outdoor patios that strategically “excavate” and deconstruct the volume. This “game” of “full/empty” creates greater flexibility and variety in the play of light inside the building.Text description provided by the architects.The Industrial Building in Viana do Castelo project consists of a new industrial unit inLanheses, Viana do Castelo, and is made up of two apparently autonomous volumes with different heights. The first volume - a large industrial/warehousing/technical area with a canopy protecting the shipping area. The second volume - a social and administrative area, comprising 2 floors above the ground level and “drawing” the main elevation of the building.The main entrance to the building is made up of the design of thefoyerwith double-height ceilings and a “suspended” staircase, which is the main element of this space. The staircase is detached from the walls and slab and is joined by a loose concrete volume that rises from the floor and forms the first three steps of the staircase. The two volumes do not touch, creating a moment of tension between them.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data