BWRX-300 SMR Development at Darlington Nuclear Site
Sector: Cement • Location: Darlington, Ontario, Canada
Source: The Energy Mix
The BWRX-300 SMR design is under development to be built at the Darlington nuclear site on Lake Ontario. As of early 2026, construction activities include digging a deep shaft for the reactor vessel, with concrete pouring expected in summer 2026. The project is planned to include four reactors, with the first expected to cost $6.1 billion and the total project at least $20.9 billion.
- Status
- Under Construction
- Sector
- Cement, Nuclear
- Location
- Darlington, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- The Energy Mix
ConstructChat
Ask ConstructChat about BWRX-300 SMR Development at Darlington Nuclear Site
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The BWRX-300 SMR design is under development to be built at the Darlington nuclear site on Lake Ontario. As of early 2026, construction activities include digging a deep shaft for the reactor vessel, with concrete pouring expected in summer 2026. The project is planned to include four reactors, with the first expected to cost $6.1 billion and the total project at least $20.9 billion. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Ontario |
City | Darlington |
Source
Source | The Energy Mix |
URL |
More Details
Record type | Project |
Sector | Cement, Nuclear |
Article published date | 2026-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
