Byrne Road Resurfacing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The City of Toledo is requesting bids to resurface Byrne Road from South Detroit to Heather downs Boulevard. This includes the removal and replacement of the wearing courses of asphalt, spot full depth repairs, re-striping of the pavement to include bike lanes, and associated pedestrian ramp upgrades.
- Status
- Closed
- Sector
- Government, Commercial, Road
- Location
- Toledo, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Byrne Road Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Toledo is requesting bids to resurface Byrne Road from South Detroit to Heather downs Boulevard. This includes the removal and replacement of the wearing courses of asphalt, spot full depth repairs, re-striping of the pavement to include bike lanes, and associated pedestrian ramp upgrades. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Toledo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Road |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
