logo
ProjectPlanned

Byron Power Uprate Project

The owner, status and timeline of this project. A free account opens every field.

Source: Shaw Local

The project involves replacing six low-pressure turbines and two high-pressure turbines at the Byron nuclear power plant. The new turbines will generate an additional 79 to 80 megawatts of energy, and the electrical system will be updated to accommodate this increase.

Status
Prospective
Sector
Wind, Nuclear, Power Generation (CCGT), Road
Location
Byron, Illinois, United States of America
Updated
19 Nov 2026
Source
Shaw Local

ConstructChat

Ask ConstructChat about Byron Power Uprate Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Byron Power Uprate Project” is an infrastructure initiative in the Wind sector, located in Byron, Illinois, United States. Taiyo aggregates data on it from Shaw Local.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project involves replacing six low-pressure turbines and two high-pressure turbines at the Byron nuclear power plant. The new turbines will generate an additional 79 to 80 megawatts of energy, and the electrical system will be updated to accommodate this increase.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Byron

Source

Source

Shaw Local

URL

More Details

Record type

Project

Sector

Wind, Nuclear, Power Generation (CCGT), Road

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project