Búzios 10 Offshore Project
Sector: Steel • Location: Rio de Janeiro, Brazil
Source: The Manila Times
Vallourec has secured a major contract with Allseas to supply line pipes for the Búzios 10 offshore project located at the Búzios field, operated by Petrobras. This contract includes nearly 18,000 tons of subsea seamless premium carbon steel line pipes, with an optional scope of almost 5,000 tons.
- Status
- Closed
- Sector
- Steel, Metal
- Location
- Rio de Janeiro, Brazil
- Updated
- 22 Jul 2026
- Source
- The Manila Times
ConstructChat
Ask ConstructChat about Búzios 10 Offshore Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vallourec has secured a major contract with Allseas to supply line pipes for the Búzios 10 offshore project located at the Búzios field, operated by Petrobras. This contract includes nearly 18,000 tons of subsea seamless premium carbon steel line pipes, with an optional scope of almost 5,000 tons. |
Location
Country | Brazil |
State | Rio de Janeiro |
Source
Source | The Manila Times |
URL |
More Details
Record type | Project |
Sector | Steel, Metal |
Article published date | 2025-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
