C-38S ASR Test Wells
Sector: Water Supply and Storage • Location: West Palm Beach, Florida, United States of America
Source: Dodge USA
The goal of the project is to construct and test two, 24-inch diameter ASR Test Wells. The ASR Test Wells will be completed with open holes drilled into the UFA and APPZ, with approximate total depths of 800 feet below land surface (bls) and 1,480 feet bls, respectively. Construct and test one dual-zone monitoring well (DZMW) with an upper monitoring zone completed between 580 feet and 680 feet bl
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about C-38S ASR Test Wells
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The goal of the project is to construct and test two, 24-inch diameter ASR Test Wells. The ASR Test Wells will be completed with open holes drilled into the UFA and APPZ, with approximate total depths of 800 feet below land surface (bls) and 1,480 feet bls, respectively. Construct and test one dual-zone monitoring well (DZMW) with an upper monitoring zone completed between 580 feet and 680 feet bls, and a lower monitoring zone completed between 1,380 feet and 1,480 feet bls. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
