C19-02773 - Com - Accepted
The status, timeline and source of this project. A free account opens every field.
Source: City of Las Vegas Open Data Portal
- Status
- Prospective
- Sector
- Commercial
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Las Vegas Open Data Portal
ConstructChat
Ask ConstructChat about C19-02773 - Com - Accepted
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | accepted |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | <div>06/25/19 Counter Review The F/D cited Ria for miscellaneous electrical issues. The electrical plan single line hand drawn no (AIC rating switch gear size missing. Suggested getting TI plan for Mariana's to develop better plan. Also missing Panel S Electrical Only |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | City of Las Vegas Open Data Portal |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
