C5 Building Envelope Repairs
Closed · Texas · Last reported Aug 2024
Source: Dodge USA
Project Description: Exterior wall repairs at the C5 Music Building. Existing masonry veneer at the upper roof wall is to be demolished and replaced with new metal panel, insulation, and vapor barrier. Existing skylight to be demolished and replaced with new. Specifications and additional details are in the associated CSP #24-31 Project Manual.
- Status
- Closed
- Sector
- Metal, Education, Commercial, Cement, Manufacturing (Industrial)
- Location
- Pasadena, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about C5 Building Envelope Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: Exterior wall repairs at the C5 Music Building. Existing masonry veneer at the upper roof wall is to be demolished and replaced with new metal panel, insulation, and vapor barrier. Existing skylight to be demolished and replaced with new. Specifications and additional details are in the associated CSP #24-31 Project Manual. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pasadena |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Commercial, Cement, Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
