logo

CA High-Speed Rail Phase 1 (San Francisco-San Jose)

Sector: Rail • Location: San Jose, California, United States of America

Source: Dodge

Project
Planning Schematics

State legislation defined this alignment. The project section will travel between stations at 4th and King in San Francisco, Millbrae-SFO (near the San Francisco International Airport), and San Jose (Diridon Station) using a blended corridor sharing tracks with Caltrain. Will ultimately run to the Salesforce Transit Center, replacing Caltrain's 4th and King Station as the northern terminus. To inc

Status
Prospective
Sector
Rail, Mass Transit, Airport, Commercial
Location
San Jose, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about CA High-Speed Rail Phase 1 (San Francisco-San Jose)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CA High-Speed Rail Phase 1 (San Francisco-San Jose)” is an infrastructure initiative in the Rail sector, located in San Jose, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

State legislation defined this alignment. The project section will travel between stations at 4th and King in San Francisco, Millbrae-SFO (near the San Francisco International Airport), and San Jose (Diridon Station) using a blended corridor sharing tracks with Caltrain. Will ultimately run to the Salesforce Transit Center, replacing Caltrain's 4th and King Station as the northern terminus. To include construction of a light maintenance facility (LMF) on the east side of the Caltrain corridor...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Jose

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Rail, Mass Transit, Airport, Commercial

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project