Cab Guaratingueta Sewerage System
Sector: Automotive • Location: Sao Paulo, Brazil
Source: World Bank Group
In June 2008, CAB Ambiental signed a 30 year contract with municipal government of Guaratingueta in the state of Sao Paulo to upgrade and operate their sewerage system. Specifically, the project aimed to upgrade sewerage collection levels to 100% by 2020 and sewerage treatment levels to 100% by 2024. In 2008, Guaratingueta, a municipality of 116,000, had sewerage collection levels of 85% and sewer
- Status
- Prospective
- Sector
- Automotive, Water Supply and Storage, Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Sao Paulo, Brazil
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cab Guaratingueta Sewerage System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | In June 2008, CAB Ambiental signed a 30 year contract with municipal government of Guaratingueta in the state of Sao Paulo to upgrade and operate their sewerage system. Specifically, the project aimed to upgrade sewerage collection levels to 100% by 2020 and sewerage treatment levels to 100% by 2024. In 2008, Guaratingueta, a municipality of 116,000, had sewerage collection levels of 85% and sewerage treatment levels of 29%. Cab Ambiental formed CAB Guaratingueta as a special purpose vehicle for the project. The contract was awarded to Cab Ambiental in March 2008 by the municipal government of Guaratingueta. Further bidding information was not available. CAB Guaratingueta was to invest 65 million reais (US $39.6 million) to construct new sewage treatment plants, new secondary and main pipeline networkds, new sewage pumping systems, and to replace damaged networks. In January 2012, a US$ 9.8 million (BRL 19.2 million) loan was granted to CAB Piquete by the state-owned bank BNDES to finance the company's investment. Figures converted based on the market rate, period average for 2008 published by the IMF. |
Original sector | Water and sewerage |
Budget |
Location
Country | Brazil |
State | Sao Paulo |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
