Cabaçal Project
The owner, status and timeline of this project. A free account opens every field.
Source: Mining.com.au
Meridian Mining is focused on completing a Definitive Feasibility Study (DFS) and subsequently the construction of the Cabaçal Project, which will be the company’s first and core production hub of the wider Cabaçal volcanic massive sulphide belt. A 2025 Prefeasibility Study highlights the project will produce 141,000 ounces of gold annually over a 10-year mine life, with a net present value of US$
- Status
- Prospective
- Sector
- Metal
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- Mining.com.au
ConstructChat
Ask ConstructChat about Cabaçal Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Meridian Mining is focused on completing a Definitive Feasibility Study (DFS) and subsequently the construction of the Cabaçal Project, which will be the company’s first and core production hub of the wider Cabaçal volcanic massive sulphide belt. A 2025 Prefeasibility Study highlights the project will produce 141,000 ounces of gold annually over a 10-year mine life, with a net present value of US$984 million and an internal rate of return of 61.2%, from a pre-production capital cost of US$248 million. |
Original sector | Mining |
Budget |
Location
Country | Brazil |
Source
Source | Mining.com.au |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
