Cabeólica Phase II Expansion Project
The owner, status and timeline of this project. A free account opens every field.
Source: ZAWYA
The Cabeólica Phase II Expansion Project in Cabo Verde is the country’s first renewable energy initiative to integrate wind power generation and battery energy storage systems (BESS) at scale. It will add 13.5 megawatts of wind generation capacity and 26 megawatt-hours of grid-connected battery energy storage, generating over 60 gigawatt-hours of clean energy annually, reducing carbon dioxide emis
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Energy Storage, Government, Telecommunications
- Location
- Cabo Verde
- Updated
- 22 Jul 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about Cabeólica Phase II Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cabeólica Phase II Expansion Project in Cabo Verde is the country’s first renewable energy initiative to integrate wind power generation and battery energy storage systems (BESS) at scale. It will add 13.5 megawatts of wind generation capacity and 26 megawatt-hours of grid-connected battery energy storage, generating over 60 gigawatt-hours of clean energy annually, reducing carbon dioxide emissions by an estimated 50,000 tonnes annually, and enhancing energy security by reducing reliance on imported fossil fuels. |
Original sector | Energy |
Budget |
Location
Country | Cabo Verde |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Energy Storage, Government, Telecommunications |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in Cabo Verde
- Electra Cabeolica Wind Project
- Cape Verde Wind Project
- Cabeolica Phase II Wind-Storage Project
- CV-GEF Energy & Water SIL (FY99)
- Expanded Cabeolica Wind Farm and Battery Energy Storage System
- Cabeolica Wind Farm Battery Storage Expansion
- Cabeolica Wind Farm Expansion and Battery Energy Storage System Upgrade
- Cabo Verde: Distributed Solar Energy Systems (SIDS DOCK)
