Cabeólica Phase II Expansion Project
Sector: Wind • Location: Cabo Verde
Source: The Tanzania Times
The project is Cabo Verde's first renewable energy initiative to integrate wind power generation and Battery Energy Storage Systems (BESS) at scale. Phase II will add 13.5 megawatts of wind generation capacity and 26 megawatt-hours of grid-connected battery energy storage, expected to generate over 60 gigawatt-hours of clean energy annually, reducing carbon dioxide emissions by an estimated 50,000
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Energy Storage, Government, Telecommunications
- Location
- Cabo Verde
- Updated
- 22 Jul 2026
- Source
- The Tanzania Times
ConstructChat
Ask ConstructChat about Cabeólica Phase II Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is Cabo Verde's first renewable energy initiative to integrate wind power generation and Battery Energy Storage Systems (BESS) at scale. Phase II will add 13.5 megawatts of wind generation capacity and 26 megawatt-hours of grid-connected battery energy storage, expected to generate over 60 gigawatt-hours of clean energy annually, reducing carbon dioxide emissions by an estimated 50,000 tonnes annually. |
Original sector | Energy |
Budget |
Location
Country | Cabo Verde |
Source
Source | The Tanzania Times |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Energy Storage, Government, Telecommunications |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in Cabo Verde
- Electra Cabeolica Wind Project
- Cape Verde Wind Project
- Cabeólica Phase II Expansion Project
- Cabeólica Phase II Expansion Project
- Cabeolica Wind Farm and Battery Energy Storage System Expansion
- Cabeolica Wind Farm and Battery Energy Storage System Expansion
- Cabeólica Phase II Expansion Project
- Cabeolica Wind Farm Expansion and Battery Energy Storage System
