logo

Cable Car Gearbox Rehabilitation Project

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Close

Cable Car Gearbox Rehabilitation Project Share this: Facebook Twitter LinkedIn SFMTA.com/CableCarGearbox Project Introduction To keep the cable car system in the state of good repair, the San Francisco Municipal Transportation Agency (SFMTA) will begin to rehabilitate the gearboxes that power the cable car system. Work to refurbish the California Line gearbox will start off first. To accommodate t

Project Information FAQ

Project Information

4 Q
The project “Cable Car Gearbox Rehabilitation Project” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Cable Car Gearbox Rehabilitation Project Share this: Facebook Twitter LinkedIn SFMTA.com/CableCarGearbox Project Introduction To keep the cable car system in the state of good repair, the San Francisco Municipal Transportation Agency (SFMTA) will begin to rehabilitate the gearboxes that power the cable car system. Work to refurbish the California Line gearbox will start off first. To accommodate the work, bus shuttles will substitute the California Cable Cars starting on Fri., Sept. 22, 2017 at start of service and will continue until the end of service on Fri, Sept 29. Cable cars will resume normal service on Saturday, Sept 30 at the start of service. Project Timeline California Line September 2017 Completed Mason Line Fall 2018 Completed Powell Line Spring 2019 Completed Hyde Line Falll 2019 Completed Project Status Completed Bus Routes and Rail Lines California Cable Car Powell / Hyde Cable Car Powell / Mason Cable Car Neighborhoods Russian Hill South of Market (SoMa) Downtown / Civic Center Nob Hill Chinatown North Beach Western Addition Financial District Pacific Heights Project Details, History or Features Bus shuttles will substitute for the California Cable Car Line during the gearbox rehabilitation. The bus shuttles will follow the California Line and pick up passengers at the curb at cable car stops. The bus will not stop in the middle of an intersection as a cable car does. The inbound bus traveling to Drumm Street will end service at Davis Street and outbound bus will begin the trip to Van Ness Avenue also at Davis. Regular bus fare of $2.75 will apply. All other cable car lines will operate as usual. The stop on California and Powell streets provides a transfer point to the Powell-Mason and Powell-Hyde lines for a delightful ride on cable cars. The purpose of the Cable Car Barn Propulsion Gearbox Rehabilitation Project is to overhaul and refurbish the five gearboxes that have been in service since 1984. They are in need of a thorough overhaul to keep the world famous cable cars running properly on the streets of San Francisco. The existing gearboxes are old and outdated that need upgrading. It takes approximately eight days to refurbish each of the four gearboxes that are functioning in the Cable Car Barn at 1201 Mason Street. A gearbox controls the cable movement for the cable car line it serves. There is a spare box kept in a storage room as a backup in case one of the boxes is not working properly. Cable car gearboxes control the movement of the cable that powers the cable car line. After the work is done on a gearbox, there will be a five-month break-in and monitoring period. Normal cable car service will resume during the testing periods. The whole project will take about three years to complete and will significantly improve the safety and reliability of the system. Tentative schedule for future line work: Mason – spring 2018 Powell – fall 2018 Hyde – spring 2019 or fall of 2019 During the eight-day working windows, bus shuttles will substitute the Powell and Mason cable car lines respectively, however when the work takes place on the Hyde Line, bus substitution service will be provided to all three cable car lines. RELATED BLOG POSTS Video: Refreshing SF’s Cable Car Gearboxes Preserving SF’s Cable Cars: Cal. Line to See First Bus Substitution Starting Sept. 22

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data