Cable Replacement
One of 10,000+ projects Taiyo tracks in Nebraska.
Source: Dodge
LES is seeking bidders to submit bids to install predominantly 1/0 and 3/0 underground cable in existing 2 SW. The cable shall be terminated in pad mounted equipment or riser poles. Switching is required to de-energize, cut off, abandon old cable, and energize the new cable. This specification sets out minimum requirements for performing the proposed work that meet the construction standards of LE
- Status
- Closed
- Sector
- Commercial, Power Transmission, Power Generation (CCGT), Government, Telecommunications
- Location
- Lincoln, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cable Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | LES is seeking bidders to submit bids to install predominantly 1/0 and 3/0 underground cable in existing 2 SW. The cable shall be terminated in pad mounted equipment or riser poles. Switching is required to de-energize, cut off, abandon old cable, and energize the new cable. This specification sets out minimum requirements for performing the proposed work that meet the construction standards of LES. It shall be the responsibility of the Contractor to review the drawings and visit the construc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Lincoln |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Transmission, Power Generation (CCGT), Government, Telecommunications |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
