Cabora Bassa Gas Project
Sector: Power Generation (CCGT) • Location: Zimbabwe
Source: Mining Journal
The Cabora Bassa project by Invictus Energy involves gas and condensate production to improve energy access for the domestic mining industry in Zimbabwe. The project includes well testing, appraisal drilling, pilot production planning, and infrastructure approvals. It aims to supply gas to replace diesel-fired generation at the Eureka gold mine and potentially supply gas to neighboring countries t
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- Mining Journal
ConstructChat
Ask ConstructChat about Cabora Bassa Gas Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cabora Bassa project by Invictus Energy involves gas and condensate production to improve energy access for the domestic mining industry in Zimbabwe. The project includes well testing, appraisal drilling, pilot production planning, and infrastructure approvals. It aims to supply gas to replace diesel-fired generation at the Eureka gold mine and potentially supply gas to neighboring countries through the Southern Africa Power Pool. |
Original sector | Energy |
Budget |
Location
Country | Zimbabwe |
Source
Source | Mining Journal |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Zimbabwe
- African Power
- Pomona Waste Management
- Zimbabwe - Alaska – Karoi Power Transmission Reinforcement Project
- Zimbabwe - Emergency Power Infrastructure Rehabilitation Project – Phase II
- Zimbabwe - Urgent Water Supply and Sanitation Rehabilitation Project – Consolidation Works
- WANKIE POWER
- ZESA POWER IV (CAHORA BASSA)
- Kupinga small hydropower
