Cabrillo Village Multi-Use Path
Sector: Water Supply and Storage • Location: Ventura, California, United States of America
Source: Dodge USA
The project consists of closing a gap on a popular Class I trail in the City of Ventura needed to create a 2.0-mile long continuous Active Transportation corridor. The proposed project is located between South Saticoy Avenue and the terminus of North Bank Drive along the Santa Clara River north bank, and consists of an entry trailhead, new paved trail, native plant landscaping, stormwater infiltra
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Car parking, Waste Processing and Treatment, Automotive
- Location
- Ventura, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cabrillo Village Multi-Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of closing a gap on a popular Class I trail in the City of Ventura needed to create a 2.0-mile long continuous Active Transportation corridor. The proposed project is located between South Saticoy Avenue and the terminus of North Bank Drive along the Santa Clara River north bank, and consists of an entry trailhead, new paved trail, native plant landscaping, stormwater infiltration elements and appurtenant work as shown on the project plans (Drawing No. 2022-D022) and in a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Ventura |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Car parking, Waste Processing and Treatment, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
