Cache Creek - Critical Infrastructure Flood Protection
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
The goal of the proposed project is to protect the critical, sole-source Cache Creek drinking water infrastructure from flooding. This will include raising the access road above the 200-year flood level, installing new wells above the 200-year flood level, decommissioning low lying wells, and raising various electrical and pumping components. These works will protect the Cache Creek Water Treatmen
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Cache Creek - Critical Infrastructure Flood Protection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The goal of the proposed project is to protect the critical, sole-source Cache Creek drinking water infrastructure from flooding. This will include raising the access road above the 200-year flood level, installing new wells above the 200-year flood level, decommissioning low lying wells, and raising various electrical and pumping components. These works will protect the Cache Creek Water Treatment Plant (WTP) from floods and help ensure uninterrupted access to safe drinking water. The following activities are proposed: 1. Raise the water treatment plant access road to above the 200-year flood level. 2. Extend the casing and electrical of well PW#7 to above the 200-year flood level. 3. Decommission the low lying well PW#6. 4. Install a safe drinking water well above the 200-year flood level as a replacement to low lying PW#6 5. Install an emergency backup generator 6. Disconnect the clearwell gravity overflow to river piping and replace with a overflow sump pump. 7. Complete a WTP flood failure evaluation and raise electrical as needed |
Original sector | Climate Resilience |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
