logo
ProjectStart

Cache Lake/Graveyard Footbridge Replacement

Sector: Power Transmission • Location: Edmonton, Alberta, Canada

Source: Dodge USA

For the purpose of bidding, assume the span of the bridge will be a min. of 15m long x 2.4m wide. Obtain Province s approval for bridge span and precise crossing location prior to proceeding to detailed design. c. Utility Locates as required 3. Demolition and off-site disposal of existing bridge infrastructure. a. All in-water work to adhere to regulatory requirements (Water Act Code of Practice f

Status
Prospective
Sector
Power Transmission, Road, Commercial, Bridge, Water Supply and Storage, Mass Transit, Government, Rail, Power Generation (CCGT)
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cache Lake/Graveyard Footbridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cache Lake/Graveyard Footbridge Replacement” is an infrastructure initiative in the Power Transmission sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For the purpose of bidding, assume the span of the bridge will be a min. of 15m long x 2.4m wide. Obtain Province s approval for bridge span and precise crossing location prior to proceeding to detailed design. c. Utility Locates as required 3. Demolition and off-site disposal of existing bridge infrastructure. a. All in-water work to adhere to regulatory requirements (Water Act Code of Practice for Water Course Crossings, Fisheries and Oceans Canada requirements, etc.) 4. Geotechnical invest...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Road, Commercial, Bridge, Water Supply and Storage, Mass Transit, Government, Rail, Power Generation (CCGT)

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project