Cachoeira Caldeirao Hydro Power Plant
Sector: Hydro • Location: Brazil
Source: World Bank Group
In December 2012, the company EDP Brasil S/A , was awarded in a competitive bidding process the contract to build and operate a 219 MW hydro power plant located in the Araguari River, state of Amapa. The names of other bidders were not disclosed.
The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. EDP Brasil S/A presented the lowest offer, a value of US$ 48.83/MWh (BRL
- Status
- Prospective
- Sector
- Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cachoeira Caldeirao Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2012, the company EDP Brasil S/A , was awarded in a competitive bidding process the contract to build and operate a 219 MW hydro power plant located in the Araguari River, state of Amapa. The names of other bidders were not disclosed. The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. EDP Brasil S/A presented the lowest offer, a value of US$ 48.83/MWh (BRL 95.31/MWh), 5.63%% below the ceiling set by the regulatory agency. The contract was signed in May 2013, and sponsors created the company Empresa de Energia Cachoeira Caldeirao S/A to lead the project during the 35-year contract period. Empresa de Energia Cachoeira Caldeirao committed to sell 100% of the output to the regulated market . Environmental regulator, Ibama, awarded an environmental license for the project in August 2013. The company Cesbe S/A engenharia e Empreendimentos was hired to conduct the EPC works for the project and supply equipment. The sponsor committed to invest US$ 468 million (BRL 1.1 billion) in the power plant. Financial closure was achieved in October 2014, when the sponsor was granted a US$ 214.5 million (BRL 504.1 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources and the chinese group China Three Gorges Corporation, which acquired 50% of the project company's shares. Construction works commenced August 2013, and operations were expected to begin by 2017. In January 2015, BNDES granted na additional US$ 53.9 million (BRL 160.3 million) loan to the Project. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.